Currently working on...
Remodeling a wine and beer retail store.

Columbiana High School

Installed a complete electrical system from a 4,160v 3-phase service down to the 120v receptacles and lighting. Included in the project was a fire alarm system, closed circuit television system and public announcement system




Girard Justice Center

The Girard Justice Center was a large building which housed a new courthouse, police station and 6 cell holding facility. A 480v 3-phase 1600 amp electrical service was installed. Included in the project was the installation of a motor control center and variable frequency drives for the geo-thermal HVAC system, a keyless entry security system, a fire alarm system, A closed circuit television system and a 35KW back-up generatar system.




General Extrusions Inc.

We installed a 19,200v 3-phase sub-station and transformers which brought the voltage down to 4,160v 3-phase. Through High voltage switch gear and transformers, we converted to 480v 3-phase and 120/208v 3-phase to power the plants'
various industrial aluminum extrusion lines.




Giant Eagle of Salem

This large grocery store doubled its size by adding a hot foods section, deli, coffee bar, a new bakery and a new produce section. The project included an energy management system, a 35KW back-up generator, an upgraded and expanded electrical service and new coolers and freezers.




St. Elizabeth's Hospital Cardiac Care Center

We ran conduit and wiring for a new 4,160v 3-phase sub feed to a new high voltage switchgear and transformer. We then ran conduit and wiring from the new 480v 3-phase 2800 amp main distribution panel to various sub panels, transformers, life critical transfer switches, and a new back-up generator. From the sub-panels we ran conduit through the 55 tons of rebar per floor for 120v receptacles and lighting so that it would be inside the main structure of poured concrete.




AT&T

We removed an old 250v direct current fire alarm system and installed a state of the art fire alarm system.




D.D. and Velma Davis Y.M.C.A.

This project was a complete electrical system installation from a 480v 3-phase 1600 amp service to the 120v receptacles and the 277v lighting. Included in the project was a motor control center and starters for the pool pumps as well as a fire alarm system,a public announcement system, and an audio system.





McBane Machine

McBane machine shop required all new conduit run and wiring pulled to various industrial machines. These machines included horizontal lathes, vertical lathes, CNC machines and other smaller items.




Leslie's Pool Supplies

This project required us to run all new lighting and power cicrcuits via new conduit and wire installation. We also installed new receptacles, lighting, mechanical timers, new exhaust fans, and an exhaust fan interlock tied to the duct smoke detectors and HVAC units.




Vintage Estates Wine & Beer

Not only did we install a new electrical system for this bar, we hand built the bar, back bar shelving, the back bar area and installed whole store audio and a cctv system.




Boxcar Lounge

We had a hand in every aspect of the construction process starting with the design and ending with the finishing touches in the interior.




Stonebridge Grille and Tavern

This was a remodel of a big chain restaraunt. New and relocated receptacles as well as relocated lighting was required. New conduit and ciruiting was run for both. The outdoor lighting was repaired and replaced as well as ladscape lighting added.